Beginning Thursday, April 27, the City of Lebanon will be repairing a sanitary sewer lateral on E. Isabella Street between Cleveland and Santiam streets. During construction (from 7:30 a.m. to 5:30 p.m.), E. Isabella Street will be closed to through traffic. Construction is expected to last two days.
Residents in the impacted area will be afforded reasonable access but should expect short
periods of time where access to individual driveways may not be possible in addition to
periodic delays and other related inconveniences.
For questions or concerns, contact Engineering at 541-258-4923 or [email protected].
Beginning Friday, April 28, the intersection of 7th Street and Walker Road will be completely closed while the contractor ties in utilities as part of the Westside Interceptor Project. Walker Road remains closed to through traffic from Sixth Street to Stoltz Hill Road A detour route using Vaughan Lane is also still in place to guide motorists around the closure.
The City of Lebanon said motorists who need access to the residential areas south of Walker Road should use the detour routes and avoid Walker Road. There are multiple gravel
trenches, construction equipment and construction workers in the area currently working on the re-construction of Walker Road.
Message Boards are currently up on Walker Road at Stoltz Hill and close to South Main Road to inform motorists of the Walker Road closure. Residents are also encouraged to go the City of Lebanon website at www.ci.lebanon.or.us/gis for continuous updates regarding
construction location and current road closures.
Again, for questions or concerns, contact Engineering at 541-258-4923 or [email protected].